Building a custom home in King
King is a York Region township with 27,333 residents. A house on a village infill lot in King City, Nobleton or Schomberg starts with different zoning from a house on rural acreage. On the Oak Ridges Moraine, check the parcel on the [province’s maps](https://www.ontario.ca/page/oak-ridges-moraine-maps) before settling on the house footprint, driveway or septic location.
Permits and bylaw rules
The Township’s [building permit page](https://www.king.ca/buildingpermits) has a New Home and Additions package and an On-Site Sewage System package. Use CityView to submit building permit applications and revisions.
The [Township’s zoning page](https://www.king.ca/zoningbylaws) says Comprehensive Countryside Zoning By-law 2022-053 applies outside the King City, Nobleton and Schomberg urban areas. Parts remain under appeal at the Ontario Land Tribunal. The Township directs owners to Schedule A to check whether their land is affected and says the amended By-law 74-53 also applies to land subject to those appeals.
Land in a regulated area may need a separate permit from the Toronto and Region Conservation Authority or the Lake Simcoe Region Conservation Authority. Confirm which authority covers your parcel early enough to account for its requirements in the site plan.
Lots, soil and climate
A sandy moraine lot and a low lot near the Holland Marsh can call for different excavation and drainage plans. Ask what the soil investigation says about footing support, groundwater and whether the excavation will need temporary dewatering.
The season
If the lot needs moraine or conservation review, allow time for the proposed house and driveway locations to change before you set an excavation date.
What drives the price and what to ask
Before you sign a contract for the King lot, check the builder’s licence and ask how the home will be enrolled with Tarion. [Tarion’s custom-home guide](https://www.tarion.com/media/five-important-steps-your-custom-home)
Compare the house price alongside [King’s development charges](https://www.king.ca/developmentcharges) and the cost of reaching the building site from the road. Ask for the well, septic system and driveway as separate line items on a rural lot.
- Which zoning rules apply to this address, and what setbacks and lot coverage did you use in the quote?
- Who submits the New Home and Additions package in CityView and handles changes if King asks for a revised site plan?
- How will you price excavation and drainage once the soil report comes back?
- Who handles any conservation authority permit, and what start date does the quote assume?
- Does the quote cover a survey and any site plan revisions needed to meet the lot coverage limit?